Altaveedan Wind Farm Enabling Works

Project Summary

Major Civil Engineering works including:

  • Earthworks (1000m3)
  • Installation of Drainage system, silt fences, retention ponds
  • Fencing and Safety Barrier Works
  • Laying of Geosynthetic ground stabilisation Geogrid (2500m2)
  • Asphalt surfacing including AC20, AC10 and HRA (1500m2)

Project Gallery

Specifications

  • Project Name: Altaveedan Wind Farm Enabling Works
  • Client: Client Name
  • Supervisor: RES (Renewable Energy Systems)
  • Date: July 2015-Sept 2015