A29 Killytoney Realignment

Project Summary

Major Civil Engineering works:

  • Earthworks (6000m3)
  • Installation of Drainage system, pipes 300mm to 150mm (3000m)
  • Culvert installation (1200mm Concrete Pipe and Headwalls)
  • Construction of SuDS Drainage Pond (176m2)
  • Chainlink and Stockproof Fencing (1400m) and Cattle Pens
  • Laying of Geosynthetic ground stabilisation Geogrid (5000m2)
  • Asphalt surfacing including AC28, AC20, AC10 and HRA (11160m2)

Project Gallery

Specifications

  • Project Name: A29 Killytoney Realignment
  • Client: TransportNI
  • Supervisor: Amey
  • Date: Nov 2014-April 2015
  • Value: ​£1.1m